High-density rack colocation means hosting racks that draw far more power, and so produce far more heat, than a typical enterprise rack. Most racks in data centres today sit around 8kW to 11kW, while current AI training racks run at 120kW to 140kW and the next generation is reported at around 200kW. Each increase in density brings different requirements for rack cooling, power delivery and floor loading.
This guide walks through each density band, the workloads that typically sit in it, the cooling method it needs, and how to work out which band your UK deployment belongs in.
Key takeaways
- The most commonly reported rack density worldwide reached 11kW in 2026, according to Uptime Institute's annual survey, so anything above 20kW is well outside the norm.
- Air cooling generally copes up to about 30kW per rack and becomes increasingly impractical above 50kW, where direct liquid cooling takes over.
- Racks at 100kW and above are as much an electrical and structural problem as a cooling one: a single 120kW AI rack can weigh around 1.36 tonnes.
- Plan for the density your hardware will need at its next refresh, not just at installation.
What counts as high-density rack colocation?
High-density rack colocation is colocation designed for racks drawing well above the industry average, usually more than 20kW of sustained load per rack. We classify any sustained rack draw above 20kW as high density, because that is roughly where standard room cooling and power distribution start to need redesign.
For context, Uptime Institute's 2026 Global Data Center Survey of more than 800 operators found the modal rack density passed 11kW for the first time, and the average (excluding a small number of facilities built for more than 30kW) was 7.8kW, as reported by Data Center Knowledge. AI hardware sits far above that line, which is why it needs purpose-built high-density colocation rather than space in a general hall.
Rack density bands at a glance
Rack density falls into five practical bands, each with its own typical workload and cooling method. The figures below are drawn from the sources cited in each section.
| Density per rack | Typical workloads | Usual cooling method | Main planning issue |
|---|---|---|---|
| Up to 10kW | Email, databases, web, virtualisation, storage | Room air with hot and cold aisles | Space and connectivity |
| 10kW to 30kW | Dense virtualisation, analytics, small GPU servers, inference | Air with containment, sometimes rear-door heat exchangers | Airflow management |
| 30kW to 50kW | Multi-node GPU servers, HPC, AI inference clusters | Rear-door heat exchangers, hybrid air and liquid | The limit of air |
| 50kW to 150kW | AI training racks, large GPU clusters | Direct-to-chip liquid cooling | Power delivery, coolant, weight |
| 150kW and above | Next-generation AI systems | Direct-to-chip liquid cooling, immersion in some cases | Electrical design and floor loading |
Up to 10kW: traditional enterprise racks
Racks up to 10kW cover most conventional business IT, and standard room air cooling handles them comfortably. In AFCOM's 2020 State of the Data Center report, the largest group of respondents ran 4kW to 6kW per rack, with an average of 8.2kW, according to Data Center Frontier.
These racks support email, ERP systems, file storage, web servers, and virtual machines. Hot- and cold-aisle layouts with computer room air conditioning are enough, and the main decisions are space, resilience, and connectivity rather than heat. If this is your profile, air-cooled colocation is the right fit, and paying for high-density infrastructure would add cost without benefit.
10kW to 30kW: dense compute and entry-level AI
Racks between 10kW and 30kW are where most organisations' growth is happening, and air cooling still works with good containment. In Uptime Institute's 2025 survey, 82% of respondents said their highest-density rack was below 30kW, and Uptime research director Daniel Bizo said standard cooling is generally adequate below that level, as Data Center Knowledge reported in August 2026.
Typical workloads here include dense virtualisation, analytics, inference on a handful of GPU servers, and rendering. Hot or cold aisle containment matters more at this level, because mixing hot and cold air wastes cooling capacity quickly. Blanking panels, sealed cable entries and sensible cabinet choice all count: our guide to server rack sizes covers depth, weight and airflow when choosing a cabinet.
30kW to 50kW: the limit of air cooling
Between 30kW and 50kW per rack, traditional air cooling approaches its practical limits, making hybrid cooling solutions increasingly important. According to the same Uptime commentary, 30kW to 40kW is often possible in limited numbers with relatively straightforward upgrades, but above 50kW it becomes increasingly impractical to cool with air.
Rear-door heat exchangers are the usual bridge in this band. A rear-door heat exchanger replaces the back door of the rack with a coil carrying chilled water, cooling hot exhaust air before it re-enters the room. The Open Compute Project's door heat exchanger white paper describes a door unit with 30kW of cooling capacity, and hybrid designs that pair door units with cold plates on the hottest components to support racks of around 80kW. Door units also have the least impact on existing air-cooled hardware, which is why they suit mixed estates.
50kW to 150kW: direct-to-chip liquid cooling
From 50kW to 150kW per rack, direct-to-chip liquid cooling becomes the standard approach. Cold plates sit directly on the GPUs and CPUs, carrying heat away in a liquid loop that is managed by a coolant distribution unit, while room air handles what is left.
This is where current AI training hardware lives. An NVIDIA GB200 NVL72 rack draws about 120kW and weighs 1.36 tonnes, according to TechRadar. Its successor, the GB300 NVL72, draws up to 142kW, and Data Center Knowledge puts the practical range for cold-plate cooling at 100kW to 150kW per rack in its August 2026 analysis of rack density limits.
We cover the full power, cooling and cabling specification for one point in this band: what 120kW per rack looks like. For the cooling method itself, see our direct-to-chip cooling service.
Beyond 150kW: where AI rack density is heading
Above 150kW per rack, the hardest problem is electrical rather than thermal. Trade press reports cited by Data Center Knowledge put the next generation of NVL72-class AI racks at roughly 190kW to 230kW, with a 600kW rack expected in the second half of 2027.
At these loads, conventional low-voltage power distribution inside the rack runs out of headroom: the same analysis notes that 54V DC busbars become impractical at around 200kW per rack, pushing the industry toward higher-voltage designs. Direct-to-chip cooling remains the main method, with immersion used for some dense or specialised deployments. Uptime's Daniel Bizo summed up the shift: racks of 100kW and above pose a bigger electrical challenge than a thermal one.
Power and floor considerations by density

Every step up in rack density changes the power and structural brief, not just the cooling. The main considerations are:
- Power per rack and redundancy. A 120kW rack needs roughly 10 times the supply of a typical enterprise rack, delivered with the same redundancy. Check that the facility can provide that per rack, not just as a hall average.
- Weight and floor loading. At 1.36 tonnes for a 120kW AI rack, raised floors and upper storeys need a structural check. Data Center Knowledge reports that heavier power equipment can cause structural problems in multi-storey buildings.
- Usable versus available space. Uptime says fewer than 4% of US data centres can currently support racks above 100kW, so empty floor space is not the same as usable capacity.
- Average versus peak. One buyer cited by Data Center Knowledge needed 140kW to 160kW per compute rack, but expected an average of about 80kW across all rack positions once network and storage racks were included.
- Coolant and pipework. Liquid-cooled racks need supply and return pipework, leak detection and space for coolant distribution units.
Example: a UK research team plans four GPU racks for model training plus two network and storage racks. The GPU racks sit in the 50kW to 150kW band and need direct-to-chip cooling, while the network and storage racks sit comfortably under 15kW on air. Planning the hall around one blended figure would either overbuild the light racks or underpower the heavy ones.
How to choose the right rack density for colocation
Choosing the right density starts with the hardware you will run in two to three years, not the hardware you have now. A sensible sequence is:
- List the hardware and its rated power from manufacturer specifications, including peak draw, not typical draw.
- Separate rack types: compute, storage and network racks usually fall into different bands.
- Map each rack type to a band using the table above, and note the cooling method each needs.
- Check the refresh path. If the next generation of your hardware moves up a band, choose a facility that can take liquid cooling without moving you.
- Confirm power, weight, and coolant capacity per rack in writing, along with the service levels for each.
- Ask how the provider prices density. How high-density racks are priced, for example, per kW committed.
If you are unsure where your workload sits, a power assessment from an engineer is the quickest way to find out, and it avoids paying for capacity you will not use.
Frequently asked questions

What is a typical rack density in a data centre?
A typical rack density in 2026 is around 8kW to 11kW. Uptime Institute's 2026 survey found the most commonly reported density was 11kW per rack, and the average across facilities, excluding a small number built for more than 30kW, was 7.8kW. AI training racks draw 10 times that or more.
How many kW per rack can air cooling handle?
Air cooling handles up to about 30kW per rack without major changes, and 30kW to 40kW in limited numbers with upgrades such as containment. Above roughly 50kW, Uptime Institute says air cooling becomes increasingly impractical, and direct liquid cooling or hybrid designs using rear-door heat exchangers take over.
When do you need immersion cooling?
Immersion cooling suits very dense or specialised deployments where hardware is designed to sit fully submerged in a non-conductive fluid. Most current AI racks up to about 150kW use direct-to-chip cooling instead. Our immersion cooling page explains how the two compare and when immersion makes sense.
Can an existing data centre be upgraded for high-density racks?
An existing data centre can often be upgraded to around 30kW to 40kW per rack with containment and rear-door heat exchangers. Going beyond 50kW usually needs liquid cooling infrastructure, more power per rack and a structural check, which is why many older halls cannot host current AI racks at full density.
Planning high-density rack colocation in the UK
High-density rack colocation is about matching each rack to the right band: air up to about 30kW, rear-door and hybrid cooling up to 50kW, direct-to-chip from 50kW to 150kW, and electrical design beyond that. Getting the band right early protects you from a costly move at the next hardware refresh.
We run air-cooled, direct-to-chip and immersion environments under one service agreement, so a deployment can move up the density bands without changing provider. To find out which band your hardware falls into, request a power assessment, and one of our engineers will review your power, cooling and growth plans.