
Healthcare Data Centre Colocation
Imaging, genomics, and AI diagnostics generate compute demands hospital server rooms were never built to cool. We provide UK colocation built for that trajectory: ISO 27001 certified, high-density ready, and operated entirely on British soil.
Why Healthcare Workloads Outgrow Conventional Colocation
Conventional halls were built around 5kW to 10kW racks. Push them past their thermal envelope and they protect themselves by derating your hardware, so time-critical diagnostic compute runs throttled.
Our immersion-cooled halls sustain 50kW to 200kW per rack without throttling, keeping patient data in a named UK facility rather than an abstracted cloud region.

How we support healthcare infrastructure
Built for UK enterprises running AI, HPC, and high-density compute
UK data residency
Your data stays on British soil, under UK jurisdiction.
ISO 27001 certified
Information security management supporting your governance obligations.
High-density ready
50kW to 200kW per rack for imaging AI, genomics, and HPC.
Resident on-site engineers
In-person installs, maintenance, and hardware changes.
Scale without renegotiating
Grow as data volumes climb. No migration, no new contract.
ISO 14001 certified
Environmental management supporting your ESG reporting.
Environments to consider
Frequently asked questions
Is this suitable for patient data?
We operate ISO 27001 certified UK infrastructure. Obligations under UK GDPR or NHS policy should be confirmed against your own framework, and we can support that with documentation.
Can you host medical imaging and diagnostic AI workloads?
Yes. Validated for NVIDIA H100 and A100 clusters at 50kW to 200kW per rack without thermal throttling.
Where is our data physically held?
In a named UK facility on British soil, with support and engineering also in the UK.
Do we own the hardware?
Yes. You bring the servers, storage, and networking. We provide the facility, immersion tanks, cooling, power, and engineering.
How does high-density help with imaging and genomics volumes?
50kW to 200kW per rack consolidates GPU-heavy processing into a smaller footprint, cutting estate cost and the latency of spreading work across low-density racks.
Ready to upgrade your infrastructure?
Stop overpaying for legacy efficiency. Get a quote for colocation, immersion or a custom build in under 24 hours.

